The week before last (about Thu 15 July) our builder installed all our bi-fold doors, which will eventually lead onto our deck.  By the end of the week they'd also managed to finish gyprocking most of the walls, made a start on the cornices, and had dug the trench down the right hand side of the driveway for the services (electricity, water & gas).

Then, on Mon 19 July they fitted the main front door, the internal garage door, the glass feature double-doors in the Study and the Pantry, and then they locked the house up :-(

Nevertheless, on Tue 20 July I could see they had fitted the staircase, and later last week I could smell they'd sealed the wet areas with fibreglass.  They also finished connected the water & gas services and filled in the trench.

Therefore, hopefully this upcoming week we'll see the internal doors fitted and maybe some of the kitchen or wet area cabinetry arrive.

Bi-fold doors installed

Rear of the house

Looking through the front door - can just make out the gyprock and the bi-fold door at the rear